SMAS Accreditation


20th Oct 2014
Accreditations


Summit Electrical have been awarded a top Health & Safety accreditation by SMAS.

 

SMAS is a proud member of the Safety Schemes in Procurement (SSIP) Forum.

 

Since the launch of SSIP, many Clients and Principal Contractors now adopt an SSIP approach to H&S pre-qualification and will only use contractors who hold a valid and in date Scheme certificate issued by an SSIP Forum member.

 

Holding a valid SSIP Member Scheme certificate means that a contractor will have demonstrated their Stage 1 H&S competence by meeting the ‘core criteria’ as set out in the Construction (Design and Management) regulations or the H&S module in PAS91.

 

A key aim of the SSIP Forum is to reduce the burden and cost of H&S bureaucracy across the construction industry and as part of this, your Worksafe certificate will be recognised by the other SSIP members who offer mutual recognition – meaning that you should not have to complete a further full H&S assessment.

 



Electrical Installation at Helen House


20th Oct 2014
Case Study


Summit recently completed the Design & Build of the Electrical Installation at Helen House.

 

The scheme was to provide a more welcoming and spacious reception area, better use of play and holistic therapy areas, refurbishment of the kitchen, Improve the workability of the bedrooms, bathrooms and family areas, including easier accessibility with large beds and wheelchairs.

 

Helen & House, a registered charity, has the time and expertise to care for children and young adults with life-shortening conditions and support their families. The two hospice houses offer specialist symptom and pain management, medically-supported short breaks and end-of-life care, as well as counselling and practical support for the whole family.


Helen House opened in 1982 as the world's first children's hospice.

 




Hallmoor School, Birmingham.


13th Oct 2014
New Contracts


BAM Construction have awarded Summit the Electrical Installation at Hallmoor School, Birmingham.

 

The three storey new build school will cater for approximately 230 students aged 4-19 years old, with various Special Educational Needs (SEN) and will replace the current school situated 400M south of the new site.

 

Summit commence on site in October and the project is scheduled to be completed in July 2015 ready for the new academic year.

 

Summit will be responsible for the Primary and Secondary Containment of all systems, Mains Distribution, Small Power, Lighting, External Lighting, Testing & Commissioning and will also be responsible for managing and coordinating the Fire and Security Specialist procured by our client.



New Contract – Primus Place, Leicester


13th Oct 2014
New Contracts


Create Construction have appointed Summit as the Electrical Contractors for the new build postgraduate student accommodation building Primus Place in Leicester.

 

In prime position for postgraduate students, Primus Place is located on Jarrom Street, and will provide a convenient and safe environment for students.

 

The development is positioned just 160M from De Montfort University campus and 800M from the University of Leicester. For those studying medicine, Leicester Royal Infirmary is located 220M from the development, along with a range of other university teaching buildings and libraries.

 

Primus Place boasts 140 larger than average, high quality studio apartments specifically designed to meet the needs of the postgraduate student market.


Summit Electrical will be responsible for the complete design, supply and installation of the Mains Distribution, Containment systems,  Small Power Installations, Lighting and  Emergency Lighting Systems, External Lighting, Data Installation, TV System, Fire Alarm System, Access Control System, Door Intercom System, CCTV Systems and Lightning Protection. Electrically works start in January 2015 for completion in August 2015.



 

  Records 1 to 4 of 4