New Contract - Primus Edge, Leicester


28th Jan 2016
New Contracts


Create Construction have appointed Summit as the Electrical Contractors for the new build accommodation building, Primus Edge in Leicester.

 

In prime position for students, Primus Edge is located on Jarrom Street, and will provide a convenient and safe environment for students.

 

Primus Edge boasts 159 contemporary, fully managed studio apartments providing the next generation of student living with en-suite bathrooms and bespoke kitchens with contemporary appliances, hotel inspired reception area with IT pods, large HD TV, study spaces, laundry and bike storage.

 

Primus Edge is in prime location next to De Montfort University and 10 minutes from University of Leicester


Summit Electrical will be responsible for the complete design, supply and installation of the Mains Distribution, Containment systems,  Small Power Installations, Lighting and  Emergency Lighting Systems, External Lighting, Data Installation, TV System, Fire Alarm System, Access Control System, Door Intercom System, CCTV Systems and Lightning Protection. Electrically works start in January 2016 for completion in August 2016.



New Contract - Audley Binswood


4th Jan 2016
New Contracts


Summit Electrical have been awarded the electrical design & build contract for the third phase of apartments and cottages at Audley Binswood Retirement Village.

 

Audley Binswood Retirement Village is located in the heart of the Royal Leamington Spa conservation area. It’s a short walk from the fine shopping and leisure facilities of Leamington Spa, including the famous Pump Rooms.

The Grade II* listed Victorian Gothic Binswood Hall, formerly known as North Leamington College, has previously been beautifully restored and forms the centerpiece of the new retirement village of approximately 90 apartments, built to the usual exacting Audley standards and retaining all of the character and majesty of the original building.

 

Binswood Hall is also home to the Audley Club, with its own luxury health club, swimming pool, library, restaurant and bar/bistro.

Summit completed Phase 2, Brunswick House, at the beginning of December 2015.

 

The third phase, Walton Court, will bring stunning new-build apartments which will be available to move into in autumn 2016. This will create a selection of 1 and 2 bedroom properties that add to the centerpiece of this luxury retirement village, set within the heart of Royal Leamington Spa.



 

  Records 1 to 2 of 2